About Company:

Pegu Hydro Venture Pvt. Ltd is a recently acquired venture by the Aviyan Group. It has planned to develop Pegu Khola Small Hydropower Project with an installed capacity of 3 MW in Dolakha District of Bagmati Province. 

Bigu Hydro Venture Pvt. Ltd. is implementing the following project:

Pegu Khola Small Hydropower Project 

Introduction:
Pegu Khola Small Hydropower Project is located within Bigu Rural Municipality of Dolakha District of Bagmati Province. Pegu Khola Small Hydropower Project is a run-of-river (RoR) type of hydropower project. The capacity of the project is 3 megawatts (MW). 

This project has a very easy road access.  It is 205.5 KM to reach project site from Kathmandu via road transportation including 133 KM black topped, remain gravel road and earthen road. Having easy road access to powerhouse and water intake is an added value for this project.


Pegu Khola Small Hydropower Project, 3MW

Project Status:

Updated Feasibility Study                                                                              Completed

Hydrological & Sediment Measurement and Analysis                            Completed

 Environmental Impact Assessment                                                           Approved

Grid Connection Agreement                                                                        Signed

Power Purchase Agreement                                                                         Signed

Electricity Generation License                                                                       Obtained

Land Acquisition                                                                                               Pvt Land – Completed Government Land – Process

Construction Power                                                                                        Under process

Access Road up to PH                                                                                    Completed

Head Office Setup                                                                                          Completed

Site Office                                                                                                         Under process

DPR                                                                                                                     Final Stage

Civil / EM Contract/ HM Contract                                                                  Under process

DDA                                                                                                                     Under process

Financial closure                                                                                             Under Process 


Key Features of the project:

 

KEY DESCRIPTION

AS PER FSR (3 MW)

Project Location

Bigu Rural Municipality of Dolakha District of Bagmati Province.

Access to Site

(Kathmandu-Charikot-Singati- Project site)

Project Type

Run-of-River (RoR)

River

Pegu River

Installed Capacity

3MW

Project Co-ordinates

Latitude : 27° 49’ 22” N to 27° 50’ 18” N

Longitude : 86° 03’ 21.5” E to 86° 04’ 59” E

Annual energy generation

16.80 GWh

Catchment Area

23.55 sq.km

Design discharge

1.95 m3/s

Gross Head

190.37 m

Phase of Project

Under Construction


   Website: https://biguhydro.com.np